Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.
Panel
bgColor#DEEBFF

Create or Edit a Stage

...

To add a new Stage, click on “Add a New Stage” or to edit a Stage, click “Edit Stage.”

...

Stage Duration Type can be “TimeBased” (in days) or “Formula Based.”

Time Based

...

- Allows you to set how long (by number of days) a stage will last. The app will automatically move to the next stage (in order) when each stage ends. Type the number of days for the stage in the “Stage Duration Type” textbox.

i. Check the “Ends at Midnight” checkbox if you would like a stage to advance to the next stage at midnight on the last day of the stage. If this box is not checked, the stage will advance at the same time of day as when the participant downloaded the app and started the study (this will result in some participants starting a new stage at 5:00 PM, and others at 8:00 AM). In most cases, the Ends at Midnight checkbox should be checked for Duration Stages.

...

Formula Based is triggered by a variable set in the study design.

...

Fill out the appropriate fields that are required denoted by “*” on the first section of creating a Schedule.

...

The last section of the form is where Rescheduling can be enabled or disabled depending on the study design. Fill out fields required denoted by “*” and click “Done.” A dialog box may pop-up asking to save changes made.

...