Create or Edit a Stage
To add a new Stage, click on “Add a New Stage” or to edit a Stage, click on “Stage”.
The “Duration Value” can be a number like “15” which means the stage will be 15 days long. If a number is entered such as “15.6:20” it means the stage is 15 days, 6 hours and 20 minutes long (dd.hh:mm).
Create or edit a Schedule
To create a new schedule in a stage, click on the “+ Schedule” button.
To see existing schedules in a stage, hit the “+” button to the left of the row.
The row will expand and show the existing schedules within the stage.
To edit a schedule, click the ‘Schedule’ button next to the schedule that needs to be edited.
Notifications: The Notifications for Scheduled Events (Fixed, Random, or Offset) appear in the Notifications bar, as a standard mobile Notification. The User will have the option to open the Assessment from the Notification bar for the amount of time specified by ‘Notification Time Out’ (i.e. 120 min or 2 hours).
Notification Time Out: Interacting with the Notification for the Event AFTER the Event has passed will open the Insight app, but will NOT allow the Participant to complete the Event.
Home | Submit a Ticket | SCC | Privacy