Panel | ||
---|---|---|
| ||
Participant Info |
Clicking on the “Participants“ tab directs the user to a list of
Study Participantsstudy participants.
Selecting “+ Add Participant“ opens the form to create a new
Participantparticipant. Required fields are marked with “*”.
Selecting the edit icon for an existing
Participantparticipant opens the same form but with the information populated from the existing
Participantparticipant.
After adding the
Participantsubject ID and selecting a
Groupgroup, select “Next“ to go to the next page to create the
Participant Scheduleparticipant schedule. A pop-up window will ask you to confirm the changes. Select “Yes“ to continue.
Panel | ||
---|---|---|
| ||
It is imperative that the participant'sSleep Timesleep time is NOT set past 11:30 pm. ASleep Timesleep time beyond 11:30 pm will interfere with the assessment schedule. |
Selecting a
Time Fieldtime field allows the option to set the
Participant Schedule for Wake Time, Sleep Time, and Preferred Timeparticipant schedule for wake time, sleep time, and preferred time for each day of the week. The times selected for a
Participantparticipant can be used to set their survey times, events, assessments, and offsetting their surveys as related to these times.
Panel | ||
---|---|---|
| ||
Wake Time |
Participant
Wakewake time is a time the participant has indicated in which they usually wake up.
Panel | ||
---|---|---|
| ||
Sleep Time |
Participant
Sleepsleep time is a time the participant has indicated in which they usually go to sleep (should not be later than 11:30 PM).
Panel | ||
---|---|---|
| ||
Preferred Time |
Participant
Preferred Timepreferred time is a time indicated by the participant in which they prefer to receive an assessment.
Info |
---|
The Participant Schedule form uses a 12-hour time format. |
The default time values for new participants are
Wake Timewake time 07:00 (7:00 am),
Sleep Timesleep time 22:00 (10:00 pm), and
Preferred Timepreferred time 18:00 (6:00 pm).
When all of the times have been set for the
Participantparticipant, select “Next“ to continue to the PHI page (only for
Studiesstudies that collect PHI). An additional pop-up window will ask to confirm the changes. Select “Yes“ to continue.
Please note PHI fields can be piped into assessments and tailored messages.
Registration Code Form - When the participant installs and opens the application, the app will generate a
Registration Coderegistration code that will need to be entered into the “Registration Code” field as shown below. The code will be a series of letters without any special characters.
Please note the participant can be created in the EDC without the
Registration Coderegistration code, but the participant will not be able to start the
Studystudy on their phone until their unique code is entered here.
Selecting “Done“ and selecting “Yes“ saves all of the updated information for the
Participantparticipant.
Panel | ||
---|---|---|
| ||
Participant Activity |
When viewing the participant’s activity log, the
Research Teamresearch team has the option to change the timezone. By default, the
Participant Activityparticipant activity will be” Your Local Time” which is the
Research Teamresearch team timezone. The other two options available are UTC (which shows the time as per the Coordinated Universal Time) and
Participant Local Timeparticipant local time (which shows the activity according to the timezone for that participant for that activity).
Panel | ||
---|---|---|
| ||
Activity |
To view the participant activity, click on the view icon next to the participant.
A list of assessments appears with schedule time(s) which indicate when an assessment is scheduled to alert the participant, start time(s) which indicate when the participant started the assessment, completion time(s) which indicate when the participant completed the assessment, and the response count(s) which indicate how many questions were recorded from the participant for that specific assessment.
Panel | ||
---|---|---|
| ||
Notification Limit |
Insight is only able to schedule less than or equal to 64 events at any one time. Events that are included in the total are Random, Fixed, Offset, and Rescheduled Events. Please note, the number of days Insight schedules out for is subject to the study design and is in no way a one design fits all approach.
For Example:
Day 1
Number of
Fixed Schedules: 1 (x2 Reschedule) = 3Number of
Random Schedules: 2 (x2 Reschedule) = 6Number of
Participant Offset: 2 (x2 Reschedule) = 6
Total Number of Events for Day 1 = 15
Number of days Insight EDC will schedule out: 4 Days = 60 Total Events (if scheduling is consistent for each day of the week)
Another Example:
Day 1
Number of
Fixed Schedules: 3 (x3 Reschedule) = 12Number of
Random Schedules: 2 (x3 Reschedule) = 8Number of
Participant Offset: 2 (x3 Reschedule) = 8
Total Number of Events for Day 1 = 28
Number of days Insight EDC will schedule out: 2 Days = 56 Total Events (if scheduling is consistent for each day of the week).Below the Activity view for the participant is the Stages view. Clicking on it will expand the participant’s transition from stage to stage, detailing when they have started a stage and when it has or will end. The default timezone is the user’s timezone and can be changed to the participant’s time zone or UTC.
Panel | ||
---|---|---|
| ||
Stages |
For TimeBased stages, the EndDate will calculate when the participant will leave the stage they are in. For example, if a Stage is set to last 5 days and a participant enters the Stage on 09/10/2023. The stage’s EndDate will calculate to 09/15/2023.
For FormulaBased stages, the EndDate will default to 1/1/0001 12:00:00AM. This will stay this way until the formula for the stage is fulfilled. For example, if a Stage is set to end when the variable [Begin] == 1 . This occurs when the participant answers the [Begin] variable with the answer that is valued at 1, then the Stage EndDate will update to the current date and time.
Panel | ||
---|---|---|
| ||
Participation |
Depending on the schedule(s) included in the Percentage Payment Scheme applied to this participant, the Participation tab will show the participant’s progress in the study stage by calculating the percentage of how many of the requisite events scheduled were completed over the total requisite events scheduled thus far.
Panel | ||
---|---|---|
| ||